Viaducts V7 – V9 – V10 – V15
Ankara -Sivas Demiryolu Projesi, Kayaş-Kirikkale Arasi (Kesim I) High Speed Railway
CLIENT
Yuksel Kappa
CITY
Turkey
TECHNOLOGICAL SOLUTION
Movable Scaffolding System
DESCRIPTION

Decks built resorting to two superior movable scaffolding systems - M1-90-S and M55-S

This project will attain the world record for span between axes, executed with BERD’s movable scaffolding system – 90 meters.

 TECHNICAL FEATURES - V7                                                    

  • PYLONS MAXIMUM HEIGHT | 59,00 m
  • FULL LENGTH | 1.800,00 m
  • MAXIMUM SPAN BETWEEN PYLONS | 90,00 m
  • WIDTH | 12,70 m

 TECHNICAL FEATURES – V10

  • PYLONS MAXIMUM HEIGHT | 94, 00 m
  • FULL LENGTH | 1.541,00 m
  • MAXIMUM SPAN BETWEEN PYLONS | 90,00 m
  • WIDTH | 12,70 m

THE OTHER SIDE IS CLOSER