Viaducts V7 – V9 – V10 – V15
Ankara -Sivas Demiryolu Projesi, Kayaş-Kirikkale Arasi (Kesim I) High Speed Railway
CLIENT
Yuksel Kappa
CITY
Turkey
TECHNOLOGICAL SOLUTION
Movable Scaffolding System
DESCRIPTION
Decks built resorting to two superior movable scaffolding systems - M1-90-S and M55-S
This project will attain the world record for span between axes, executed with BERD’s movable scaffolding system – 90 meters.
TECHNICAL FEATURES - V7
- PYLONS MAXIMUM HEIGHT | 59,00 m
- FULL LENGTH | 1.800,00 m
- MAXIMUM SPAN BETWEEN PYLONS | 90,00 m
- WIDTH | 12,70 m
TECHNICAL FEATURES – V10
- PYLONS MAXIMUM HEIGHT | 94, 00 m
- FULL LENGTH | 1.541,00 m
- MAXIMUM SPAN BETWEEN PYLONS | 90,00 m
- WIDTH | 12,70 m