Incremental Launching
The construction method of pre-stressed concrete deck bridge, by incremental launching, is performed by the execution of successive sections of the deck bridge in a prefabricated area located at one end of the work to be performed.
SERVICES PROVIDED
- Consulting and researching of Construction methods;
- Coordination and monitoring work;
- Technical assistance;
- TurnKey service concept;
- Supply of a Traveller for the Internal Formwork;
- Oil-Hydraulic systems of the Formwork and pushing devices;
- Scaffolding and Working Platforms;
- Instrumentation and Control System from the pushing device;
- Specialized labour
PORTFOLIO